SOUTH AFRICA | WC | CAPE TOWN
Fire Rated Wall/ Fire Protection/ Building Renovation/ Building Materials/ Fire Safety
RFQ 019 2026 - Quantum V3 Facility Fire Rated Wall on Gridline 2 of the Quantum V3 Facility Main Building - Closing 17 July 2026 at 12h00
Supply and installation of a 60- minute fire- rated wall Supply and installation of a 60- minute fire- rated wall on gridline 2 of the Quantum V3 Facility Main Building, including CS board partition installation, mechanically fixed to a steel stud gridwork. Total maximum area: **** equipment for the duration of works. Up to 12m high.
AI helper
Request for Quotation (RFQ 019 2026) for the supply and installation of a 60-minute fire-rated wall on gridline 2 of the Quantum V3 Facility Main Building. Closing date: 17 July 2026, 12:00 PM. Quotations to be submitted to ***@***. *. * requirements include CSD registration, CIDB registration (Grade 2 or higher), and proof of insurance. Evaluation is based on an 80/20 preference points system. A penalty of R1,**** per calendar day applies for late completion, up to 10% of the contract value. Offer must be valid for 60 working days.
A minimum 12-month workmanship warranty is required from the date of practical completion.
The contract will be awarded to the bidder with the highest total number of points under the 80/20 preference points system, unless other objective criteria allow.
Bidders must be registered on the Central Supplier Database (CSD) with active status, registered with the Construction Industry Board (CIDB) for general building works (GB) or specialist works (SF) for grade 2 or higher, and submit proof of public liability insurance of minimum R2,000,000.
A penalty of R1,**** per calendar day will be deducted for every day the installation exceeds the agreed-upon completion date, up to a maximum of 10% of the total contract value.
The Asezco reserves the right to request any additional information and/or samples of items quoted.
Failure to adhere to mandatory administrative and technical requirements, late or incomplete quotations, or obtaining information that could put the Asezco at risk may lead to disqualification.