Passenger Rail Agency Of South Africa
Construction
The appointment of a contractor for the refurbishment at denver station in the south gauteng region to be done over one ( 01) month construction period.
ticket office remedial works to joinery: replacement of 3 x drawers, 1. 1 sum 1 replacement of handles to match existing . remedial work to antibandit door: fix or replace door 1. 2 sum 1 closer 1. 3 locksets to station managers office1x door item 1 pressure jetting of existing drainage replacement of 1. 4 sum 1 missing manhole covers 1. 5 remedial works to ablution: replacement of cistern item 1 boundary wall: repair and installation of damaged 1. 6 m 5 palisade panels to match existing total carried to summary 2 subway drainage: clearing of existing debriswaste including carting away 2. 1 sum 1 and pumping underground water out of the trench chopbreak the existing reinforced concrete floor slab and 2. 2 m 12 cart away spoil restricted excavation for the perforated pitch fibre subsoil 2. 3 pipes 300 x 300 as shown in the drawing including m 20 compaction to 90 modified aashto lay 100mm dia perforated pitch fibre pipe subsoil drainage pipe including 250 micron imprevious membrane 2. 4 bidum as shown in the dr
Tender Close Date: