09/22/2025 - SOUTH AFRICA | GT | PRETORIA
Testing
REQUEST FOR A DESIGN AND BUILD ( TURNKEY) CONTRACTOR FOR DEMOLITION OF EXISTING UNITS AND CONSTRUCTION OF NEW PREFABRICATED HOUSING UNITS AT THE HAWEQUA AND OBIQUA CORRECTIONAL CENTRES AT ALLANDALE MANAGEMENT AREA. - Bid No: ****
Prefabricated house units 1 preliminaries and general, 2 demolition and alterations, 3 8 units construction cost, 4 contingencies, subtotal construction cost, 5 value added tax vat @15, total cost, 1 site establishment sum, 1 health and safety file sum, 1 insurance sum, 1 guarantee sum, 1 delivery and transport cost sum, 1 prefab installation sum, 1 deestablishment sum, 1 professionals, 8 architecture sum, 9 structural engineer sum, 10 electrical engineer sum, 11 occupational health and safety officer sum, 12 soil testing by an engineer sum, 1 demolition and alterations, 2 earthworks and foundation, 3 concrete, formwork and reinforcement, 4 waterproofing, 5 roof coverings and structure, etc, 6 carpentry and joinery, 7 floor covering, plastic lining, etc, 8 ceilings, partitions and access flooring, 9 metalwork, 10 plumbing and drainage, 11 electrical installation, subtotal of new prefab 1 block 4 units sum 1, 2 blocks 8 units sum 2, subtotal of 8 new prefab units, 1 preliminaries and general, 2 demolition and
AI helper
The tender is for the construction of prefabricated house units at the Obiqua and Hawequa correctional facilities in Western Cape, South Africa. The tender document includes detailed specifications for various construction phases, including preliminaries, demolition, alterations, construction, contingencies, and VAT. The tenderer must visit the site before submitting their bid to assess the nature and extent of the work and the value of salvageable materials. No claims for variations in the contract sum will be entertained. The existing prefabricated housing contains asbestos. The nature of the ground is assumed to be loose sandy material, possibly interspersed with hard rock or soft rock. A soils investigation has been carried out on site. The contractor must carry out the whole of the works with as little mess and noise as possible and with a minimum of disturbance to occupants in the building and to adjoining premises and their tenants. The contractor shall provide proper protection and provide, erect and remove any temporary tarpaulins that may be necessary during the progress of the works. The cost of making, storing and testing of concrete test cubes is included. The waterproofing of roofs, basements, etc. shall be laid under a ten-year guarantee. All timber shall be treated against insect pests. Floor coverings and wall linings shall be fixed to perfectly dry and clean screeded surfaces. The documents include detailed specifications for various materials and processes, including concrete, formwork, reinforcement, waterproofing, roof coverings, carpentry, joinery, floor coverings, ceilings, partitions, access flooring, metalwork, plumbing, and drainage, and electrical installation. The tenderer must comply with all specifications and contract conditions.
The waterproofing of roofs, basements, etc. shall be laid under a ten-year guarantee. waterproofing of roofs, basements, etc. shall be laid under a ten year guarantee.
The tenderer shall visit the site and satisfy himself as to the nature and extent of the work to be done and the value of the materials salvageable from the alterations. view site before submitting his tender the tenderer shall visit the site and satisfy himself as to the nature and extent of the work to be done and the value of the materials salvageable from the alterations.
The contractor must manufacture a sample panel incorporating all the above features, such samples shall be subject to approval by the engineer and architect. he contractor shall manufacture a sample panel incorporating all the above features, such samples shall be subject to approval by the engineer and architect