SOUTH AFRICA | WC | KNYSNA
Lift Safety Checks
Servicing of the Lift - Knysna Public Library: 25 November 2026
Servicing of the lift at Knysna Public Library Quarterly servicing of lift, safety brake features, safety gear, landing door closers, car gate, trailing cable, floating car key switches, gate contact, overrun stopping limit, limit switches, rope drum divertor, fixing sheaves, lubrication, landing door door shoes, sills and tracks, motor maximum load fixings, gear box, control panel, connections, landing earth of architraves installation, slack rope alarm, emergency light, car door guards for drive moving parts, landing guide shoes, car door panels
AI helper
Servicing of lift at Knysna Public Library, quarterly from 01 December or upon appointment up to 30 June 2027. Service provider must be accredited to issue compliance certificates per SANS 15454:2006. Service certificates must be provided to senior librarian after each service. Quotations must be firm, inclusive of VAT, valid for 90 days. 30 days payment terms. Evaluation based on 80/20 preference points system. Functionality requirements: minimum 20 points out of 30 for experience and references. Total RFQ amount below R200,****, not exceeding R300,****.
Servicing must be done quarterly, commencing from 01 December or upon appointment up to 30 June 2027. The RFQ closing date is 25 November 2026. servicing of the lift - knysna public library: 25 november 2026
Payment is made within 30 days after submission of invoice. 30 days payments terms and conditions of the invoices will be applicable and after the delivery of goods and services in the municipality.
The 80/20 preference points system applies, with 80 points for price and 20 points for specific goals. rfqs will be evaluated according to the **** preference points system.
Service provider must be accredited to issue compliance certificates in line with SANS ****:****. service provider must be accredited to issue compliance certificates in line with relevant sans requirements including sans ****: ****.
Penalties are calculated using the current prime interest rate for each day of delay. deduct from the contract price, as a penalty, a sum calculated on the delivered price of the delayed goods or unperformed services using the current prime interest rate calculated for each day of the delay
Failure to submit original and valid tax clearance certificate will result in invalidation of the bid. failure to submit the original and valid tax clearance certificate will result in the invalidation of the bid.