SOUTH AFRICA | NW | RUSTENBURG
Medium City
Structural Analysis
Rfq - request for quotation for geotechnical inspection
Geotechnical and engineering assessment on the moving structure at Cullinan Water Treatment Plant Geotechnical and structural analysis of existing structure, site inspections, nondestructive lab tests, engineering report with solution and proposed cost, report signed off by registered professional engineer
AI helper
RFQ for geotechnical and structural assessment at Cullinan Water Treatment Plant. Compulsory site inspection on 20 November 2026 at 10:00. Quotations due 24 November 2026 by 12h00 via email only. Must include CSD vendor number, RFQ reference, SBD4 form, 30-day validity. Evaluation uses 80:20 preference points (price 80, specific goals 20). Requires registered geotechnical/structural engineer and COIDA compliance. Health and safety document required before site work.
Quotations must be submitted by 24 November 2026 by 12h00. The document states: quotations should be submitted on or before the request for quotation deadline 24 November 2026 by not later than 12h00.
The evaluation uses the 80:20 preference point system. The document states: will be evaluated in terms of the ppr 2022 using the 80:20 preference point system with price 80 and specific goals 20.
Requires a registered geotechnical/structural engineer with relevant experience. The document states: a registered geotechnicalstructural engineer with the relevant experience 1x relevant project conducted registered engineering lab coida.
A compulsory site inspection will be held. The document states: a compulsory site inspection will be conducted 20 november 2026 cullinan water treatment plant 10:00.
Late or non-responsive quotations will be rejected. The document states: quotations received after the closing date will not be accepted and all nonresponsive bids will be rejected.