Refurbishment of Male Change Rooms at Flow Laboratory
refurbishment of male change rooms at flow laboratory 1. Deassemble the existing steel male change room, relocate it including wooden lockers approximately 10 meters from its current position, and rebuild it at the new location with one additional side approx. 2. 2m x 2. 2m to be newly fabricated and integrated. 2. Fabricate to integrate seamlessly with the existing modules align panel joints, flashings, roof line. 3. Dismantle and remove existing lockers from the current male change room, rebuild reinstall lockers in the new location, ensure alignment stability and anchor to floor. 4. Remove existing carpet tiles from the current structure, lift tiles carefully to avoid tearing or curling. Install carpet tiles in the new structure, and lay out tiles in the same pattern/orientation as original. 5. Paint in grey as the original structure and open ventilation vents. 6. Safety file.